Oil tanks
Location: Zark, Jordan
Assigner: Joepetrol
Role of TMP in the project: Main contractor
Nature of activities: Construction of tanks and pipelines, steel structures and industrial electrical installations - Three crude oil tanks are built, each with a capacity of 33 000 cubic meters. TMP has also built the necessary pipelines for water and oil, steel structures and industrial electrical installations.
Realization period: 1994 - 1995
Type of construction: Industrial construction