Objects

Oil tanks

Location: Zark, Jordan

Assigner: Joepetrol

Role of TMP in the project: Main contractor

Nature of activities: Construction of tanks and pipelines, steel structures and industrial electrical installations - Three crude oil tanks are built, each with a capacity of 33 000 cubic meters. TMP has also built the necessary pipelines for water and oil, steel structures and industrial electrical installations.

Realization period: 1994 - 1995

Type of construction: Industrial construction